Testing & QA

Check out the full list of services below, or contact our managers right now!

Before a product is presented to the end user, it must be tested. Our QA engineers check the functionality, usability, integrations, and other components of an application, website, or software. We divide the testing process into several stages, each of which has a unique approach to solving problems. Thus, our clients can choose the optimal set of test tasks that meet their needs.

  • Web-site development

  • Mobile app development

  • SaaS development

  • Product development

  • MVP development

Software testing
Quality Assurance
Design testing
Functionality testing
Compatibility testing
Performance testing
Integration testing
  • 01 Unit testing

    Check the correctness of individual software units and components

  • 03 System testing

    Assess the compliance of the entire system with the specified requirements and its behaviour in the real environment

  • 02 Integration testing

    Check the interaction between integrated components and modules.

  • 04 Acceptance testing

    Confirm that the software meets business requirements and is ready for launch.

  • 01 Planning

    Define the overall quality assurance strategy and project methodology.

  • 03 Monitoring

    Monitor the progress of testing, deviations, and make the necessary adjustments.

  • 02 Implementation

    Implement the planned quality assurance activities and perform testing.

  • 04 Evaluation

    Summarise the results of quality control, evaluate the overall performance of the system, and provide feedback.

  • 01 Requirements analysis

    Check the compliance of the design with user requirements, accessibility and usability standards.

  • 03 Usability testing

    Check the User Flow to make sure it is accessible and corresponds to the expected user journey.

  • 02 Visual and functional testing

    Check that visual elements are the same on different platforms and devices. We examine the alignment and positioning of elements.

  • 01 Preparation

    Analyse functional requirements, define test scenarios, and set up the testing environment.

  • 03 Reporting

    Document any inconsistencies or defects found during testing. We summarise the data and provide a report.

  • 02 Testing

    Conduct positive and negative testing to understand how the system works in normal and non-standard scenarios.

  • 01 Compatibility requirements

    Identify browsers, devices, operating systems, and network conditions relevant to the application.

  • 03 Run regression testing

    This avoids creating difficulties in other areas by eliminating compatibility issues.

  • 02 Testing

    Check the work in web browsers (Chrome, Firefox, Safari, Edge), operating systems (Windows, macOS, Linux), and mobile devices (iOS, Android).

  • 01 Planning

    Define critical scenarios that reflect real-life usage patterns. We set performance criteria and thresholds that the application must meet.

  • 03 Analysis and reporting

    Our PM regularly provides reports on all work performed.

  • 02 Testing

    Run performance tests, monitor system metrics, including response time, operation speed, CPU load, and memory usage.

  • 01 Requirements analysis

    Сlarify integration requirements, define data formats for exchange, including data structures, protocols, and communication methods.

  • 03 Integration testing

    Сheck the data flow between the integrated systems, test error and recovery scenarios.

  • 02 Setting up the testing environment

    Сreate a test environment that reflects the integration. We use mocks and stubs for external dependencies.

  • 04 Monitoring

    Implement tools to track data flow and identify any problems during integration testing.

Software testing
  • 01 Unit testing

    Check the correctness of individual software units and components

  • 02 Integration testing

    Check the interaction between integrated components and modules.

  • 03 System testing

    Assess the compliance of the entire system with the specified requirements and its behaviour in the real environment

  • 04 Acceptance testing

    Confirm that the software meets business requirements and is ready for launch.

  • 01 Planning

    Define the overall quality assurance strategy and project methodology.

  • 02 Implementation

    Implement the planned quality assurance activities and perform testing.

  • 03 Monitoring

    Monitor the progress of testing, deviations, and make the necessary adjustments.

  • 04 Evaluation

    Summarise the results of quality control, evaluate the overall performance of the system, and provide feedback.

  • 01 Requirements analysis

    Check the compliance of the design with user requirements, accessibility and usability standards.

  • 02 Visual and functional testing

    Check that visual elements are the same on different platforms and devices. We examine the alignment and positioning of elements.

  • 03 Usability testing

    Check the User Flow to make sure it is accessible and corresponds to the expected user journey.

  • 01 Preparation

    Analyse functional requirements, define test scenarios, and set up the testing environment.

  • 02 Testing

    Conduct positive and negative testing to understand how the system works in normal and non-standard scenarios.

  • 03 Reporting

    Document any inconsistencies or defects found during testing. We summarise the data and provide a report.

  • 01 Compatibility requirements

    Identify browsers, devices, operating systems, and network conditions relevant to the application.

  • 02 Testing

    Check the work in web browsers (Chrome, Firefox, Safari, Edge), operating systems (Windows, macOS, Linux), and mobile devices (iOS, Android).

  • 03 Run regression testing

    This avoids creating difficulties in other areas by eliminating compatibility issues.

  • 01 Planning

    Define critical scenarios that reflect real-life usage patterns. We set performance criteria and thresholds that the application must meet.

  • 02 Testing

    Run performance tests, monitor system metrics, including response time, operation speed, CPU load, and memory usage.

  • 03 Analysis and reporting

    Our PM regularly provides reports on all work performed.

  • 01 Requirements analysis

    Сlarify integration requirements, define data formats for exchange, including data structures, protocols, and communication methods.

  • 02 Setting up the testing environment

    Сreate a test environment that reflects the integration. We use mocks and stubs for external dependencies.

  • 03 Integration testing

    Сheck the data flow between the integrated systems, test error and recovery scenarios.

  • 04 Monitoring

    Implement tools to track data flow and identify any problems during integration testing.

Tools we use

  • QTP

  • Selenium

  • Appium

  • Robotium

  • Navicat

  • SQL Server

  • SoapUI

  • Snagit

  • A1 Website Analyzer

  • BrowserStack

  • TestFlight

  • Xcode

  • LoadRunner

  • JMeter

  • Axure RP

  • Ace Project

  • Gns3

Let's work together!

hand

Portfolio

Experience of 300+ projects

Watch all
i
i
Watch all

Let's work together!

Fill out the form and our manager will contact you
Please fill in the field
This field is required
This field is required
Please fill in the field
and / or
Please fill in the field
Your budget limit:

By submitting this form, you agree with our Terms & Conditions and Privacy Policy

i